Most studios don’t fail at making games. They fail at remembering how they made them.

I’ve watched this happen more times than I’d like to admit. A lead designer leaves six months before ship. A new producer joins mid-production and spends three weeks just trying to figure out what decisions were made and why. A QA team finds a bug that was already fixed, undone, fixed again, and undone again because nobody wrote down the reasoning the first time. The documentation problem in game studios isn’t about not having the right tool. It’s about not taking documentation seriously until it’s already too late.

That said, the right tool actually does matter. I spent the better part of this past year auditing how several studios (ranging from four-person indie teams to mid-size studios with around 80 staff) handle their internal documentation, and what surprised me was how consistently people are using the wrong tool for the wrong job. Confluence where they need something lightweight. Notion where they need something structured. Google Docs for everything and then wondering why nothing is findable.

Key takeaways
  • Notion suits small-to-mid indie teams (under 30 people) best; Confluence scales better above 40+ staff with Jira integration.
  • The biggest documentation failure in studios isn't missing pages, it's missing *context*: why a decision was made, not just what it was.
  • Free tiers of Notion and Confluence both cap at around 10 seats or limited features; budget $8-$15 per seat/month for real team use.
  • Git-based documentation (Markdown in repos) works surprisingly well for technical docs but fails for design and narrative work.
  • A wiki no one maintains is worse than no wiki, it actively misleads new team members.

The actual landscape of options (as of August 2026)

Let me give you the honest lay of the land before I get into opinions.

ToolBest ForFree Tier?Paid plansGame Studio Adoption
NotionSmall-mid indie teams, flexible structureYes (limited)Per user; check current pricingVery high in indie
ConfluenceMid-to-large studios, Jira integrationYes (10 users)Per user; check current pricingStandard in mid/AAA
Google Docs/DriveQuick drafts, shared writingYes (unlimited)Per user; check current pricingNearly universal, often misused
ObsidianSolo/small teams, local-first, offlineYesPer user; check current pricingGrowing, niche
NuclinoLightweight wiki alternativeYes (50 items)Per user; check current pricingSmall but passionate user base
CodaData-heavy docs, automationYes (limited)Per user; check current pricingLow but rising
Git + MarkdownTechnical/code-adjacent docsYesFree (with version control)Common for tech docs only

These prices are current as of August 2026. They shift. Always check the vendor’s pricing page directly before budgeting.

Notion vs. Confluence: the fight everyone has

For a long time Confluence felt like the only serious option at mid-size studios. It integrated with Jira, which most production teams already lived in, and it had a structure that enforced some discipline.

Then small teams started thriving in Notion, producing documentation that was more organized, more current and more actually used than many far larger Confluence instances.

Here’s what I think is actually going on. Confluence rewards teams that already have disciplined documentation habits. The structure helps you maintain what you’re already doing well. But for a team that’s still building those habits, Confluence’s rigidity becomes an excuse not to document at all because “setting it up properly” becomes the blocker. Notion’s flexibility lowers the barrier to just writing something down.

The catch with Notion: that same flexibility becomes a mess without someone actively curating the structure. Six months into a project, an unmanaged Notion workspace can look like a junk drawer. If nobody owns the information architecture, it collapses.

Practical worked example: A 12-person indie studio I consulted with switched from Google Docs to Notion in early production on their current project. They built a simple three-level hierarchy: Game Pillars at the top, System Design pages underneath, and individual feature specs at the bottom. Six months later, onboarding a new contractor took about two hours instead of the two days it had taken on their previous project. Same team, different tool, different habits around the tool.

What nobody talks about: decision logs

Related video

Codecks -- Game Development Project Management Tool · Gamefromscratch on YouTube

This is the documentation type that studios almost universally skip, and it’s the one that causes the most pain.

A design wiki tells you what the game does. A decision log tells you why it does it that way, what alternatives were considered, and what would need to change to revisit that call. Without that context, every future team member who reads your wiki is reading half the story.

I made this mistake myself on a project years back. We had meticulous feature specs. When a new producer joined six months before our gold date, she was constantly making suggestions that had already been considered and rejected eighteen months earlier, not because she was bad at her job but because there was no record of the conversation. We lost weeks to re-litigating closed debates.

The fix isn’t complicated. You can do this in a simple Notion database or even a Confluence page template. The fields that matter: the decision, the date, who made it, what alternatives were rejected, and what would trigger revisiting it. That last field is the one people skip, and it’s arguably the most useful.

Notion’s database view actually handles this better than most tools because you can filter and sort by project phase, system, or decision-maker. Confluence can do it too with macros, but it’s clunkier.

Technical documentation: the case for Markdown and Git

For anything code-adjacent, README files and Markdown docs living directly in your version-controlled repository have a real advantage that wikis don’t: they change when the code changes (assuming your engineers are disciplined about it, which is a big assumption, but a trainable one).

What surprised me when I started paying more attention to this was how many tools have quietly improved their Markdown support. Obsidian, in particular, has become a legitimate option for small studios that want local-first, offline-capable documentation with robust linking between pages. It’s not a collaboration tool in the traditional sense, but with the Obsidian Sync add-on or a shared Git repo as the vault, small teams make it work.

This won’t scale past maybe 15 people before it gets unwieldy. But for a solo dev or a two-to-three person team, it’s genuinely excellent for design notes and system documentation.

For a solo developer or tiny team, Obsidian with a shared GitHub repo as the vault can cost nothing. Its graph view, the visual map of links between notes, is a quick way to spot systems that are underdocumented, and a well-linked vault makes onboarding freelancers late in a project far easier.

The tools that support documentation without being documentation tools

Two things I actually recommend to every studio regardless of their wiki choice:

Loom (or any async video tool) for decisions and walkthroughs. A three-minute screen recording of a designer walking through a new system design is worth ten pages of written spec for onboarding. These aren’t a replacement for written docs, but they’re a powerful supplement. Loom has a free tier and paid business plans.

Linear or Jira for linking tasks to decisions. If a ticket closes because of a design decision, there should be a link from that ticket to the decision log entry. This sounds like overhead. It’s not. It’s the connective tissue that lets you reconstruct why the game looks the way it does eighteen months later.

Sources


Photo: cottonbro studio via Pexels